Marble Logistics: Packing, Loading and Delivery Checks
Plan crate identification, loading information and delivery inspection for stone orders.

Plan handling with the product
Blocks, slabs and cut-to-size pieces need different handling plans. Obtain net and gross weight, crate dimensions, piece quantities and equipment requirements. Have qualified operators plan lifting, access and unloading.
Match crates and piece lists
Use consistent crate and piece numbers, dimensions and quantities. If vein direction matters, match labels with the layout. Record pre-loading photographs and visible packaging condition.
Agree delivery scope
Confirm transport, packing, insurance and unloading responsibilities before comparing prices. Record the named delivery place and applicable term. Agree damage reporting and keep delivery documents and photographs.